Quality Assurance

To be always able to deliver high quality products to our customers, the highest level of quality assurance is essential for us .This starts with the contract review over the entire project cycle and ends with the shipping process.
We have therefore implemented a Quality Management System according to ISO 9001 allowing for continuous improvement of our
processes.
Quality Assurance
Main Milestones for Quality Assurance
  • 1.Project and Production Planning Control ( PPPc )including
    Reports to Customer on a Weekly Basis
  • 2.Mould Design Control / Inspection of Preliminary and Final Designs
  • 3.Mould Core and Cavity Steel Hardness and
    Dimension Control
  • 4.Mould Electrodes Inspection
  • 5.Mould Pre-Assembly Inspection
  • 6.Mould Trial Report and Samples Inspection including
    Dimensional Control
  • 7.Optimization Loop
  • 8. Mould Pre-Shipment Final Inspection
  • 9. Mould Shipment including Final Design, Electrodes,
    Steel certificates, Maintenance Document, etc.

Main QC Equipments:
1.CMM Machine
2.Optical Projector
3.Height Gauge

ISO 9001-2015 Rigistered Certification